Section 301 tariffs are now 145%+ on many China categories. If you haven't calculated your actual annual tariff bill, this call will do it in 30 minutes.
Find Out Exactly How Much
You're Overpaying in Tariffs
Book a free 30-minute call with a Dewin Vietnam sourcing expert. We'll map your China spend, run the numbers, and show you which of your parts qualify for $0 Section 301 tariff sourcing from 179+ audited Vietnam factories.
Who This Call Is For
Different roles, different pain points. Same outcome: a clear picture of what Vietnam sourcing actually means for your operation.
π₯ Pain: HTS code tariff bills are eating your cost targets
β Outcome: Walk away with a Vietnam cost model for your top 5 SKUs
π₯ Pain: Supply chain concentration in China is a board-level risk
β Outcome: Get a 90-day China-to-Vietnam transition roadmap for your top product lines
π₯ Pain: You need qualified Vietnam suppliers β fast β with audit documentation
β Outcome: See shortlisted, 50-point audited factories for your specific processes
What We Cover in 30 Minutes
A structured agenda β not a rambling sales call. Here's exactly what happens.
Your China Spend Breakdown
We map your current China import spend by HTS chapter to calculate your real Section 301 exposure β not an estimate, your actual tariff bill.
Part Qualification for Vietnam
Not every part is right for Vietnam sourcing. We review your part types, tolerances, certifications, and volumes against our 179+ factory capabilities β and tell you honestly what transfers and what doesn't.
Vietnam vs China Landed Cost Math
We run a side-by-side landed cost comparison: China ex-factory + freight + Section 301 vs Vietnam ex-factory + freight + $0 tariff. For most CNC and casting programs, the gap is 30β50%.
Factory Match Preview
We preview 2-3 shortlisted factories from our audited network that fit your process and certification requirements β including their Dolphin Audit QCLDM scores and real on-site photos.
Transition Risk Assessment
We walk through the top 3 transition risks for your specific situation: COO anti-circumvention documentation, lead time adjustments, first article inspection requirements, and quality documentation continuity.
Next Steps & Timeline
If the numbers work, we agree on a concrete next step: upload drawings for factory matching, start with a pilot order, or run a parallel sourcing trial alongside your current China supply.
What Clients Say After the Call
Three real clients. Three different starting points. Same result β a clear path to saving money.
"Within 20 minutes of the call, Dewin had mapped our top 8 CNC parts to 3 Vietnam factories I'd never heard of β all with real photos and audit scores. We closed our first Vietnam order 6 weeks later."
"I came in skeptical. I'd heard Vietnam sourcing pitches before that went nowhere. Dewin was different β they showed me real factories, real audit documentation, and ran an honest cost comparison on the spot."
"The strategy call was the most useful 30 minutes I've spent on supply chain in two years. Specific, honest, and backed by data I could actually bring back to my board."
30 Minutes. No Obligation. Real Numbers.
- Calculate your actual Section 301 tariff exposure
- Identify which parts qualify for Vietnam sourcing
- Preview 2-3 matched, audited Vietnam factories
- Get an est. landed cost comparison vs China
- Map a 90-day transition timeline if numbers work
We'll confirm your timeslot and send a brief pre-call questionnaire so the 30 minutes are 100% focused on your situation β not generic background.
Request Your Free Strategy Call
Common Questions About the Call
What happens on the strategy call?
Do I need to prepare anything before the call?
Is this a sales pitch or a genuine consultation?
How fast can Dewin turn around a factory match after the call?
What if I'm still sourcing from China and not sure if Vietnam is right?
Still Not Sure? Start Smaller.
Not ready for a call? These self-serve tools give you real numbers in under 5 minutes.