China Section 301 tariffs: 7.5–25% on top of normal duties · Vietnam: $0 Section 301

Vietnam Part Qualification Checklist

Answer 8 questions. Find out in 3 minutes if your parts are ready to move to Vietnam — and get an estimated Section 301 tariff savings figure.

✅ 179+ audited Vietnam factories ✅ $0 Section 301 tariff on Vietnam goods ✅ 50-point Dolphin Audit per supplier
Step 1 of 8 0% complete
1 Process Fit

What is the primary manufacturing process for your part?

Vietnam has 179+ audited factories across all major processes. Select the best match.

What the Checklist Evaluates

8 dimensions that determine how well your parts will fit Vietnam manufacturing — and how much you can save.

🔩
Process Fit
Does Vietnam have the right manufacturing process? (CNC, casting, sheet metal, molding, etc.)
🇨🇳
Tariff Exposure
Current Section 301 tariff rate on your parts — the primary savings lever.
💰
Program ROI
Annual spend size determines whether tooling + transition costs pay back quickly.
📐
Tolerance Achievability
Do Vietnam factories have the inspection equipment to hold your tolerances?
📦
Volume Fit
Vietnam factories optimize for production runs of 500+ units. Low volumes need extra evaluation.
📋
Documentation Requirements
FAI, PPAP, COO — Dewin manages all of these. ITAR-controlled parts are flagged early.
⏱️
Transition Timeline
Urgency affects factory match priority and whether expedited qualification is needed.
🎯
Overall Qualification Score
Composite score from all 7 dimensions — determines factory match tier and priority.

Vietnam Factory Capabilities at a Glance

Key qualification parameters by process — based on our 179+ audited factory network.

Process Typical Tolerance MOQ Guidance Inspection Available Section 301 HTS
CNC Machining ±0.01–0.05mm 50–200 pcs CMM, VMM, calipers Ch.84/73/76 — 25%
Die Casting (Al) ±0.1–0.3mm 500–1,000 pcs CMM, dimensional report Ch.76 — 25%
Sheet Metal ±0.5mm / ±1° 100–500 pcs VMM, go/no-go gauges Ch.73/76 — 25%
Injection Molding ±0.1–0.3mm 1,000+ pcs Color comparator, gauges Ch.39/85 — 7.5–25%
Investment Casting ±0.3–0.5mm 200–500 pcs Hardness tester, calipers Ch.73 — 25%
Forging ±0.5–1.0mm net 500+ pcs Hardness, dimensional Ch.72/73 — 25%
Stamping ±0.1–0.3mm 1,000+ pcs Go/no-go, CMM for tooling Ch.73/76 — 25%
Assembly Per sub-part specs 500+ sets Final assembly check, IQC Varies by BOM

China Section 301 rates shown. Vietnam: $0 Section 301. Source: USTR, Trade Act 1974.

Dewin's 6-Step Part Qualification Process

From checklist completion to first production shipment — what happens after you submit.

1
Day 1–2
Checklist & Intake
Complete this checklist + share drawings/specs. We map your parts to our factory network within 48 hours.
2
Day 3–5
Factory Match
We select 2–3 Dolphin-audited factories best suited to your process, tolerances, volume and certification needs.
3
Day 5–10
RFQ & Quote
Factories quote your drawings. Dewin verifies pricing realism against market benchmarks and your Section 301 savings.
4
Day 10–14
FAI Planning
We plan First Article Inspection including CMM inspection plan, material certs, and COO documentation requirements.
5
Week 6–10
First Article Inspection
Our on-ground team witnesses FAI at the factory. CMM report, material certs, and COO package sent to you for approval.
6
Ongoing
Production & Ongoing QC
Pre-shipment inspection on every production run. You get inspection reports before every shipment leaves Vietnam.

Buyers Who've Qualified Their Parts Through Dewin

"We needed a dual-source for CNC turned shafts. Dewin matched us to a factory with a CMM on-site, ran FAI, and we had approved first articles in 8 weeks. Section 301 savings alone justified the switch."

Francisco García Quintana
LAROME

"The part qualification process was thorough. They mapped our BOM to two factories, coordinated PPAP Level 2, and managed the COO documentation. We avoided $110K in Section 301 tariffs in year one."

Greg L. Wilhite
DOMS

"I was skeptical that Vietnam could hold our tolerances. Dewin showed us factories with CMMs and VMMs before we committed. The FAI came back cleaner than what we were getting from our China supplier."

Vishnu Shanker
Texas Technology

Common Questions About Part Qualification

Ready to Move Your Parts Off China?

179+ audited Vietnam factories. 50-point Dolphin Audit. On-ground team. $0 Section 301 tariff.