Vietnam Part Qualification
Checklist
Answer 8 questions. Find out in 3 minutes if your parts are ready to move to Vietnam — and get an estimated Section 301 tariff savings figure.
What is the primary manufacturing process for your part?
Vietnam has 179+ audited factories across all major processes. Select the best match.
What the Checklist Evaluates
8 dimensions that determine how well your parts will fit Vietnam manufacturing — and how much you can save.
Vietnam Factory Capabilities at a Glance
Key qualification parameters by process — based on our 179+ audited factory network.
| Process | Typical Tolerance | MOQ Guidance | Inspection Available | Section 301 HTS |
|---|---|---|---|---|
| CNC Machining | ±0.01–0.05mm | 50–200 pcs | CMM, VMM, calipers | Ch.84/73/76 — 25% |
| Die Casting (Al) | ±0.1–0.3mm | 500–1,000 pcs | CMM, dimensional report | Ch.76 — 25% |
| Sheet Metal | ±0.5mm / ±1° | 100–500 pcs | VMM, go/no-go gauges | Ch.73/76 — 25% |
| Injection Molding | ±0.1–0.3mm | 1,000+ pcs | Color comparator, gauges | Ch.39/85 — 7.5–25% |
| Investment Casting | ±0.3–0.5mm | 200–500 pcs | Hardness tester, calipers | Ch.73 — 25% |
| Forging | ±0.5–1.0mm net | 500+ pcs | Hardness, dimensional | Ch.72/73 — 25% |
| Stamping | ±0.1–0.3mm | 1,000+ pcs | Go/no-go, CMM for tooling | Ch.73/76 — 25% |
| Assembly | Per sub-part specs | 500+ sets | Final assembly check, IQC | Varies by BOM |
China Section 301 rates shown. Vietnam: $0 Section 301. Source: USTR, Trade Act 1974.
Dewin's 6-Step Part Qualification Process
From checklist completion to first production shipment — what happens after you submit.
Buyers Who've Qualified Their Parts Through Dewin
"We needed a dual-source for CNC turned shafts. Dewin matched us to a factory with a CMM on-site, ran FAI, and we had approved first articles in 8 weeks. Section 301 savings alone justified the switch."
"The part qualification process was thorough. They mapped our BOM to two factories, coordinated PPAP Level 2, and managed the COO documentation. We avoided $110K in Section 301 tariffs in year one."
"I was skeptical that Vietnam could hold our tolerances. Dewin showed us factories with CMMs and VMMs before we committed. The FAI came back cleaner than what we were getting from our China supplier."
Common Questions About Part Qualification
Ready to Move Your Parts Off China?
179+ audited Vietnam factories. 50-point Dolphin Audit. On-ground team. $0 Section 301 tariff.